top of page

Top Projects

liberary.jpg

Bibliotheca Alexandria

March 2001

e37b6dbcc6fd5e39139aeeb4f4ca8b44.jpg

Cairo Tower

March 2001

City-Stars-Mall-the-largest-shopping-complex-in-Egypt-Color-figure-available-online.png

City Stars

March 2001

Unknown-7.jpeg

St. Regis

Year of completion - 2015

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

Unknown-8.jpeg

Maspero

March 2001

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

كايرو-بيزنس-بارك-صث.jpg

Cairo Business Plaza

March 2001

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

Unknown-5.jpeg

Grand Museum

March 2001

With this project, I helped my client set up a short term plan with long term benefits. I then provided expert advice and strategic planning to help them with implementation. Would you like to learn more about my services?

MahmoudKhalilMuseum-01.jpg

Mahmoud Khalil Museum

March 2001

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

Cairo-Since-1900__Page_152_Image_0002-700x513.jpg

AL Ahram News

March 2001

Rennovation of Main Electrial Substation.
Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

Gaber03.jpg

Alex Railway Station (Sidi Gaber)

March 2001

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

2015-635711237029507346-950_edited_edited.jpg

Saudi Arabia Embassy

March 2001

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System

Power-House-Team.jpg

Ras Shukeir Power House

March 2001

Engineering, Design, procure, install and construct Power House Upgrade

13253.jpg

Mohamed Naguib Military

March 2001

Supply, Supervision on installation, testing & Comissioning of Automatic Voltage Regulators.

​Supply, Supervision on installation, testing & Comissioning of Automatic Transfer Switches

8ktZ8EujcNnuUFtBPsC6diqzZIvE4FoYCJKBArKd.png

Cairo Festival City

March 2001

Supply, Supervision on installation, testing & Comissioning of GE Automatic Tranfer Switch.

Supply of GE Disconnect Switches

​

B6sFXS7IMAEHrTC-scaled.jpg

Aswan Heart Center

March 2001

Supply, Supervision on installation, testing & Comissioning of Automatic Voltage Regulators.

Supply of GE Disconnect Switches

​

venue.jpg

Dar El Fouad

March 2001

Supply, Supervision on installation, testing & Comissioning of Automatic Voltage Regulators.

Supply of GE Disconnect Switches

​

03.jpg

Wadi El Neil Hospital

March 2001

Rennovation of Old Electrial Substation.
Electrical Work for connecting Old Electrical Substation with new Extension
Supply, Supervision on installation, testing & Comissioning of Dry Type Transformer
Supply, Supervision on installation, testing & Comissioning of UPS system
Supply of GE Disconnect Switches
Supply, Supervision on installation, testing & Comissioning of Automatic Voltage Regulators
Supply, Supervision on installation, testing & Comissioning of Automatic Transfer Switches
Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System.

Crédit-Agricole.jpeg

Credit Agricole Fifth Settlement

​

March 2001

Supply, Design, Supervision on installation, testing & Comissioning of GE Busway System.
Supply, Supervision on installation, testing & Comissioning of Automatic Transfer Switches.

07- Peace Vector VII C.jpg

Peace Vector AICI

March 2001

Supply of Switchgear, Pad-mounted Metal-enclosure Switchgear & Pad-mounted Transformers.
Supply, Supervision on installation, testing & Commissioning of Upgrade Kit for existing Standby Power plant Switchgear

7854794.jpg

Marriott  Hotel Zamalek

March 2001

Rennovation of Electrical Substation

Unknown-5.jpeg

Jolie Veil Sharm El Sheikh

March 2001

In the consulting industry, each situation is unique and requires a specific set of solutions. For this project, I helped my client define the ideal outcome for the situation, and through strategic planning we were able to achieve a great end result.

OilRig.jpeg

GUPCO Rehabilitation of Morgan 36 Complex

March 2001

Design, Engineering, Supply, Testing, Commssioning & Startup of 
Low Voltage Switchgear and MCC
Low Voltage Motor Control Centers 
Dry Type Transformer
Low Voltage Lighting Power Panel Boards

Civil Engineer Surveying

Process Automation

March 2001

This project is a great example of how I keep my clients’ best interests in mind. We started by conducting a thorough budget analysis, and slowly built a long-term plan for the next few phases. To learn more, contact me today.

Modern Bridge

Technology Acquisition and Training

March 2001

In the consulting industry, each situation is unique and requires a specific set of solutions. For this project, I helped my client define the ideal outcome for the situation, and through strategic planning we were able to achieve a great end result.

bottom of page