Telecom Egypt / WE – El Roda Central
Supply and installation of MV switchgear, transformers, RMU, earthing system, fire systems and Civil works for all rooms.
Telecom Egypt / WE
Scope of Work & Execution
Telecom Egypt / WE – El Roda Central – Supply, installation, testing and commissioning of the substation's medium-voltage switchgear, power transformers and ring main units (RMU), together with the earthing system and fire protection system. The scope also included the complete 3D modeling of all substation rooms, ensuring accurate coordination of equipment layouts, cable routes and clearances prior to installation.
Project Overview
- Client Telecom Egypt / WE
- Category Telecommunications
- Main Contractor EL Serafy Engineeing LLC
- Consultant Telecom Egypt / WE
- Start Date 2021
- Completion Date 2026
- Location Cairo, Egypt
Need a Similar Solution?
Consult our engineering team for technical evaluations or tender inquiries.
Inquire About This Project1000+
Engineered for Uptime, Built for Scale
From custom switchgear assembly to turnkey LV/MV electrical contracting, we deliver robust infrastructure solutions backed by 24/7 SLA maintenance.
Empowering Industry Leaders Through Strategic Collaboration
We build enduring partnerships grounded in trust, delivering robust, high-performance solutions engineered to power growth and operational excellence.
'Built on Trust. Driven by Engineering Excellence.'